Samples Marketing & PR, fictional client

Download PDF Book a call about Marketing & PR (opens scheduling)

Sample deliverable: Marketing & PR

Launch campaign plan

Ridgeback Fabrication. A 60-person metal fabrication shop launching a modular railing line.

Prepared by Shipwright Labs, October 2026

Sample deliverable prepared for a fictional client. Names, figures, and findings are illustrative.

1Summary

Ridgeback Fabrication is a 60-person metal fabrication shop. For 22 years it has built custom stair and balcony railings for commercial contractors. It is now launching Ridgeback Modular Rail, a line of pre-engineered railing sections that ship in standard lengths and install with one bracket system.

Customers know Ridgeback for custom work. This campaign has to introduce a product to people who have never bought one from the shop, and give the sales team qualified conversations to follow up.

Campaign length
6 weeks
Audiences
3
Qualified leads, target
40
Trade press placements, target
4

A qualified lead is a named contact with a project or a stocking need in the next six months.

Ridgeback Fabrication, Bramblewood, Marisol Keane, and the quotes in the press release are fictional.

2Messaging

Positioning statement

For commercial contractors who need code-compliant railings installed on schedule, Ridgeback Modular Rail is a pre-engineered railing system that installs in about half the time of custom welded railing. It is made by a shop that has fabricated custom railings for 22 years.

Key messages

MessageProof points
Installs in about half the timeBolt-together sections and one bracket system; timed installs on three pilot projects
Engineered to code, with the calculations to prove itSections engineered to building code guard load requirements when installed to the published details; stamped calculations for each standard configuration
Made by fabricators, not a catalog22 years of custom railing work; shop support and custom pieces for unusual site conditions

Voice

  • Say: specific numbers from the pilot projects, the names of the trades who install it, and plain words a superintendent would use.
  • Avoid: claims the shop can't prove, such as "strongest" or "cheapest"; design-magazine language; and anything that suggests the custom work is going away.

3Audiences and channels

AudienceWhat they care aboutChannelsCall to action
General and railing contractorsInstall time, crew hours, lead time, and fewer callbacksTrade press, email to the shop's contractor list, the regional trade show, and sales callsRequest a quote for a current project
Architects and specifiersCode compliance, finishes, and specification documentsA three-part specification with CAD and Revit details, architecture trade press, and lunch-and-learn sessions that earn AIA continuing education creditDownload the specification package
Building supply distributorsMargin, stocking sizes, and reorder lead timeDistributor sales calls, trade show meetings, and a partner program sheetBook a distributor meeting

4Press release

Ridgeback Fabrication

Release
For immediate release, September 14, 2026
Contact
Media relations, Ridgeback Fabrication

Ridgeback Fabrication launches Ridgeback Modular Rail, a railing system that installs in about half the time of custom welded railing

Bramblewood, Va., September 14, 2026. Ridgeback Fabrication, a commercial metal fabrication shop, today launched Ridgeback Modular Rail, a line of pre-engineered steel and aluminum railing sections for commercial stairs, balconies, and walkways. Sections ship in standard lengths and install with a single bracket system, so crews bolt railings in place instead of welding them on site.

On three pilot projects this summer, installers finished railing runs in about half the time of comparable custom welded railings, with no field welding and no hot-work permits.

"Contractors kept telling us railings were the last thing holding up their inspections," said Marisol Keane, president of Ridgeback Fabrication. "We've built custom railings for 22 years. Modular Rail takes what we learned and puts it in a system a crew can install in a day."

Modular Rail comes in three finishes, with stamped engineering calculations for each standard configuration. Specification sheets and CAD details are available on the company's website. Ridgeback is also opening a distributor partner program for building supply distributors in the Mid-Atlantic.

About Ridgeback Fabrication. Ridgeback Fabrication is a 60-person metal fabrication shop that has designed and built custom railings, stairs, and structural steel for commercial contractors since 2004.

###

5Campaign calendar

WeekPressEmailSocialTrade showSales enablement
Week 1Release to trade press; pitch two feature storiesLaunch email to the contractor listLaunch video and product photosBooth confirmed; demo rig builtProduct page and quote request form live; sales one-pager and price sheet
Week 2Editor follow-ups; offer a pilot site visitArchitect email with the specification packageInstall time-lapse from a pilot projectMeeting invitations to distributorsCall guide for each audience
Week 3First placement expectedContractor case study emailCustomer quote cardsDemo rehearsal; show offer setDistributor partner program sheet
Week 4Second placement expectedShow reminderLive posts from the show floorRegional trade show and booth meetingsFollow up on every lead within 2 business days
Week 5Third placement expectedFollow-up to every booth leadShow recapNoneArchitect lunch-and-learn sessions
Week 6Fourth placement expectedLast call for launch quotesPilot project case studyNonePipeline review and handoff to sales

6Measurement

Month 1 snapshot, weeks 1 to 4
KPITargetWeeks 1 to 4Status
Qualified leads4027On track
Trade press placements43Ahead of plan
Product page visits3,0002,140On track
Launch email open rate35%38%Ahead of plan
Trade show booth meetings2522Missed by 3; show is over
Quote requests127Behind pace
Leads by audience
AudienceTargetWeeks 1 to 4
Contractors2215
Architects85
Distributors107
Total4027

Contractors and distributors are on pace. Architects lag, which is expected, because the lunch-and-learn sessions fall in week 5. The trade show produced 22 meetings, against a target of 25. Quote requests are behind pace at 7 of 12. Weeks 5 and 6 shift time toward architect follow-up and toward turning the 22 booth meetings into quote requests.