Sample deliverable: Marketing & PR
Launch campaign plan
Ridgeback Fabrication. A 60-person metal fabrication shop launching a modular railing line.
Sample deliverable prepared for a fictional client. Names, figures, and findings are illustrative.
1Summary
Ridgeback Fabrication is a 60-person metal fabrication shop. For 22 years it has built custom stair and balcony railings for commercial contractors. It is now launching Ridgeback Modular Rail, a line of pre-engineered railing sections that ship in standard lengths and install with one bracket system.
Customers know Ridgeback for custom work. This campaign has to introduce a product to people who have never bought one from the shop, and give the sales team qualified conversations to follow up.
- Campaign length
- 6 weeks
- Audiences
- 3
- Qualified leads, target
- 40
- Trade press placements, target
- 4
A qualified lead is a named contact with a project or a stocking need in the next six months.
Ridgeback Fabrication, Bramblewood, Marisol Keane, and the quotes in the press release are fictional.
2Messaging
Positioning statement
For commercial contractors who need code-compliant railings installed on schedule, Ridgeback Modular Rail is a pre-engineered railing system that installs in about half the time of custom welded railing. It is made by a shop that has fabricated custom railings for 22 years.
Key messages
| Message | Proof points |
|---|---|
| Installs in about half the time | Bolt-together sections and one bracket system; timed installs on three pilot projects |
| Engineered to code, with the calculations to prove it | Sections engineered to building code guard load requirements when installed to the published details; stamped calculations for each standard configuration |
| Made by fabricators, not a catalog | 22 years of custom railing work; shop support and custom pieces for unusual site conditions |
Voice
- Say: specific numbers from the pilot projects, the names of the trades who install it, and plain words a superintendent would use.
- Avoid: claims the shop can't prove, such as "strongest" or "cheapest"; design-magazine language; and anything that suggests the custom work is going away.
3Audiences and channels
| Audience | What they care about | Channels | Call to action |
|---|---|---|---|
| General and railing contractors | Install time, crew hours, lead time, and fewer callbacks | Trade press, email to the shop's contractor list, the regional trade show, and sales calls | Request a quote for a current project |
| Architects and specifiers | Code compliance, finishes, and specification documents | A three-part specification with CAD and Revit details, architecture trade press, and lunch-and-learn sessions that earn AIA continuing education credit | Download the specification package |
| Building supply distributors | Margin, stocking sizes, and reorder lead time | Distributor sales calls, trade show meetings, and a partner program sheet | Book a distributor meeting |
4Press release
Ridgeback Fabrication
- Release
- For immediate release, September 14, 2026
- Contact
- Media relations, Ridgeback Fabrication
Ridgeback Fabrication launches Ridgeback Modular Rail, a railing system that installs in about half the time of custom welded railing
Bramblewood, Va., September 14, 2026. Ridgeback Fabrication, a commercial metal fabrication shop, today launched Ridgeback Modular Rail, a line of pre-engineered steel and aluminum railing sections for commercial stairs, balconies, and walkways. Sections ship in standard lengths and install with a single bracket system, so crews bolt railings in place instead of welding them on site.
On three pilot projects this summer, installers finished railing runs in about half the time of comparable custom welded railings, with no field welding and no hot-work permits.
"Contractors kept telling us railings were the last thing holding up their inspections," said Marisol Keane, president of Ridgeback Fabrication. "We've built custom railings for 22 years. Modular Rail takes what we learned and puts it in a system a crew can install in a day."
Modular Rail comes in three finishes, with stamped engineering calculations for each standard configuration. Specification sheets and CAD details are available on the company's website. Ridgeback is also opening a distributor partner program for building supply distributors in the Mid-Atlantic.
About Ridgeback Fabrication. Ridgeback Fabrication is a 60-person metal fabrication shop that has designed and built custom railings, stairs, and structural steel for commercial contractors since 2004.
###
5Campaign calendar
| Week | Press | Social | Trade show | Sales enablement | |
|---|---|---|---|---|---|
| Week 1 | Release to trade press; pitch two feature stories | Launch email to the contractor list | Launch video and product photos | Booth confirmed; demo rig built | Product page and quote request form live; sales one-pager and price sheet |
| Week 2 | Editor follow-ups; offer a pilot site visit | Architect email with the specification package | Install time-lapse from a pilot project | Meeting invitations to distributors | Call guide for each audience |
| Week 3 | First placement expected | Contractor case study email | Customer quote cards | Demo rehearsal; show offer set | Distributor partner program sheet |
| Week 4 | Second placement expected | Show reminder | Live posts from the show floor | Regional trade show and booth meetings | Follow up on every lead within 2 business days |
| Week 5 | Third placement expected | Follow-up to every booth lead | Show recap | None | Architect lunch-and-learn sessions |
| Week 6 | Fourth placement expected | Last call for launch quotes | Pilot project case study | None | Pipeline review and handoff to sales |
6Measurement
| KPI | Target | Weeks 1 to 4 | Status |
|---|---|---|---|
| Qualified leads | 40 | 27 | On track |
| Trade press placements | 4 | 3 | Ahead of plan |
| Product page visits | 3,000 | 2,140 | On track |
| Launch email open rate | 35% | 38% | Ahead of plan |
| Trade show booth meetings | 25 | 22 | Missed by 3; show is over |
| Quote requests | 12 | 7 | Behind pace |
| Audience | Target | Weeks 1 to 4 |
|---|---|---|
| Contractors | 22 | 15 |
| Architects | 8 | 5 |
| Distributors | 10 | 7 |
| Total | 40 | 27 |
Contractors and distributors are on pace. Architects lag, which is expected, because the lunch-and-learn sessions fall in week 5. The trade show produced 22 meetings, against a target of 25. Quote requests are behind pace at 7 of 12. Weeks 5 and 6 shift time toward architect follow-up and toward turning the 22 booth meetings into quote requests.