Sample deliverable: Engineering strategy & staffing
Engineering assessment and 90-day plan
Quillstack. A B2B software company with 12 engineers, after its Series A.
Sample deliverable prepared for a fictional client. Names, figures, and findings are illustrative.
1Summary
Quillstack sells scheduling and dispatch software to field service companies. It closed its Series A this spring, has 12 engineers, and plans to double its customer count in the next 18 months. The CEO asked three questions: can the team ship faster without breaking things, who should be hired next, and what would an investor's technical due diligence find?
Over three weeks we reviewed the code, the delivery pipeline, and the production setup, and we interviewed the CTO, all 12 engineers, and the head of product.
- Releases a week, today to target
- 1 to 10
- Lead time from merge to production
- 9 to 2 days
- Key-person risks
- 2
- Recommended hires
- 3
2Current state
| Area | Finding | Severity | Recommendation |
|---|---|---|---|
| Architecture | One application and one database serve every customer; the scheduling engine is tightly coupled to billing | Medium | Put billing behind an internal interface before the billing migration |
| Delivery | Releases go out once a week in a 4-hour manual window; changes wait 9 days on average from merge to production | High | Automate the deployment pipeline and release behind feature flags, daily at first |
| Reliability | No on-call rotation or alerting on key flows; customers found all 3 outages last quarter before the team did | High | Alert on the five most-used flows and start a weekly on-call rotation |
| Security | 7 engineers share one production database account; internal tools have no single sign-on | High | Individual access with audit logging; single sign-on for every internal tool |
| Team | One engineer holds all infrastructure knowledge; another is the only person who understands billing | High | Pair and document both areas in the first 30 days; hire to remove both single points of failure |
3Team and hiring
| Structure | Today | Day 90 |
|---|---|---|
| Teams | One team of 12, all reporting to the CTO | Two product teams of 5 and a platform team of 2, plus the three hires: 15 people in engineering |
| Management | The CTO manages 12 engineers directly | An engineering manager leads the product teams; the CTO owns architecture and hiring |
| Releases | Weekly, run by one engineer | About 10 a week, by any engineer, through the pipeline |
| On call | Informal: whoever notices | Weekly rotation across all 12 engineers, each trained before a first shift |
| Role | When | Why |
|---|---|---|
| Engineering manager | Search starts in week 1; hired by day 60 | The CTO cannot manage 12 people and set architecture at the same time |
| Senior platform engineer | Search starts in week 1; hired by day 75 | Removes the infrastructure key-person risk and owns the deployment pipeline |
| Senior backend engineer, billing | Search starts by day 45; hired by day 90 | Leads the billing migration and removes the second key-person risk |
Interview loop: senior platform engineer
| Stage | Length | What it tests |
|---|---|---|
| Recruiter screen | 30 min | Motivation, logistics, and compensation fit |
| Technical conversation | 60 min | Systems they have run in production, and what broke |
| Practical exercise | 90 min, paired | Fix a failing deployment pipeline in a sample repository |
| Incident review | 45 min | A real outage they handled and what they changed afterward |
| Team and CTO | 45 min | Collaboration, documentation habits, and how they teach others |
4Build versus buy
| Decision | Recommendation | Reasoning |
|---|---|---|
| Authentication and single sign-on | Buy a managed identity service | Enterprise prospects are asking for single sign-on. Building and securing it in-house would tie up a quarter of the team for months, and it is not what customers pay Quillstack for. |
| Billing | Buy a subscription billing platform and retire the custom billing code | The custom code is the second key-person risk, and usage-based pricing is on the roadmap. A billing platform handles invoicing, tax, and failed payments out of the box. |
| Internal analytics | Buy a managed data warehouse and reporting tool; build only the data models | Product and finance need the same numbers. Building dashboards inside the app slows product work, but the data models are specific to Quillstack and worth owning. |
590-day plan
| Days | Steps | Owner | Outcome |
|---|---|---|---|
| Days 1 to 30 | Document and pair on infrastructure and billing; individual production access with audit logging; start the engineering manager and platform engineer searches; alerting on the five most-used flows | CTO and the two key engineers | Both key-person areas documented and covered by a second engineer; the shared database account removed |
| Days 31 to 60 | Automated deployment pipeline with a license scan, and feature flags; daily releases; on-call rotation starts; first backup restore test; identity service selected; billing engineer search starts | CTO and the infrastructure engineer | Daily releases; lead time under 4 days; engineering manager hired |
| Days 61 to 90 | Split into two product teams; single sign-on for internal tools through the company's workspace accounts; customer single sign-on live on the new identity service; billing platform selected and migration planned; SOC 2 Type I readiness review starts; platform engineer starts and billing engineer hired | Engineering manager and CTO | 10 releases a week; lead time about 2 days; new teams in place |
6Due diligence readiness
| Risk an investor would flag | Status today | Fix |
|---|---|---|
| No SOC 2 report | Not started; two enterprise prospects have asked for one | Start a SOC 2 Type I readiness review in days 61 to 90; target a Type II report within 12 months of day 1 |
| Key-person dependencies | 2 engineers each hold critical knowledge alone | Documentation, pairing, and two hires in the 90-day plan |
| Shared production credentials | 7 engineers share one database account | Individual access with audit logging in days 1 to 30 |
| Untested disaster recovery | Backups run nightly but have never been restored | A quarterly restore test, starting in days 31 to 60 |
| Open-source licenses | Never reviewed | An automated license scan in the pipeline, with flagged packages reviewed |
| IP assignment | 2 former contractors never signed IP assignments | Counsel requests confirmatory assignments from both before the next round; if either declines, we identify the code they wrote so counsel can assess it |